← Back to All Workshops & Audits
On-site engineering site visit + comprehensive technical report 1 Full day on-site assessment + 5 business days report delivery Client property across Victoria, NSW, and South Australia

Rural Microgrid & Solar Curtailment Mining Feasibility Audit

On-site engineering assessment of your rural property, agricultural switchboard, and solar/hydro generation profile to model profitable off-grid and curtailment mining.

Rural Microgrid & Solar Curtailment Mining Feasibility Audit

Who This Is For

Farmers, agricultural facilities, rural landowners with commercial solar installations facing zero-export grid caps.

Practical Knowledge & Bench Outcomes

  • Determine exact available surplus kilowatt-hours across monthly seasonal solar curves
  • Assess substation, transformer head, and main switchboard capacity for continuous inductive load
  • Design shed ventilation layout (negative pressure vs positive pressure CFM) to survive 42°C heatwaves
  • Model capital cost (ASICs, PDUs, ventilation, cabling) vs operational yield under variable energy pricing

Curriculum & Session Schedule

Phase 1: Pre-Visit

Historical Energy Interval Data Analysis

Reviewing 12 to 24 months of NEM interval data, solar inverter logs, and property site plans.

Phase 2: On-Site Day

Switchboard, Transformer & Shed Inspection

Conducting thermal imaging of existing switchboards, testing fault loop impedance, and measuring ambient shed temperatures.

Phase 3: Modeling

Airflow & Electrical Capacity Modeling

Calculating fan static pressure requirements, intake filtration surface area, and cable voltage drop.

Phase 4: Delivery

Comprehensive Report & Electrician Briefing

Delivering an actionable engineering blueprint your licensed electrical contractor can build from.

Scope & Equipment Exposure

Comprehensive power and environmental site assessment, single-line electrical diagram review, and customized equipment sizing report.

What Is Included

  • Full-day on-site inspection by a qualified power systems engineer
  • Thermal and acoustic environmental baseline measurement
  • Detailed 25-page Feasibility Report with single-line diagrams, airflow CFM calculations, and equipment BOM
  • 1-Hour video consultation to review the findings with your local electrical contractor

What Is Excluded

  • Physical electrical installation labour and equipment purchase costs
  • Distribution Network Service Provider (DNSP) formal connection applications

Lead Instructor & Prerequisites

Lead Instruction: Craig Sterling, Principal Power Systems Consultant.

Preparation: Have ready recent electricity bills, NEM 15-minute or 30-minute interval data files, and solar inverter monitoring credentials.

Constraints & Class Size: Site must be accessible by road within VIC/NSW/SA. Remote properties subject to standard travel expenses.

Enrollment Overview
Workshop Fee
From $2,400 AUD + travel
Quote-based on distance from Gippsland and electrical complexity of property
Duration: 1 Full day on-site assessment + 5 business days report delivery
Format: On-site engineering site visit + comprehensive technical report
Facility: Client property across Victoria, NSW, and South Australia

Next Step

Request an audit quote by providing your property location and current solar/transformer capacity on our contact page.

Inquire About This Session
Direct Phone Support: Questions before booking? Call our Cowwarr bench team directly at 0473 915 284 (Mon-Fri 8:30am - 5:00pm AEST).